Jkr Standard Specification 2014
Hdb standard specification for building works and other installations 2012 edition hdb standard specification for civil engineering works 2012 edition.
Jkr standard specification 2014. A follower long dolly shall not be used unless approved by s. They shall be obtained from a source approved by the s. Standard specification for road works. The ingredients for mortar shall be measured in proper spcification boxes and shall be mixed on a clean boarded platform or in an approved mechanical batch mixer.
The contractor shall also clean all glass panes and leave every part of the completed works included in this contract in a clean sound and tidy condition to the approval of the s. Jkr standard specification pdf free download pdf. Pindaan tarikh muka surat. Wires cast in these blocks for the purpose of tying them to the reinforcement shall be as described in sub section 7.
Preliminaries and general conditions no. Who shall decide. Jkr standard specification 2014 pdf a minimum of one complete thread shall protrude from the nut. Jkr standard specifications for building works 2005 edition jkr standard specifications for building works 2014 edition jkr standard specifications for road works 2008 edition singapore.
Initially the standard deviation σ shall be calculated from at least 35 consecutive test results taken over a period exceeding 3 months and which is immediately. Design output of the truss members battens connections specificatino and wall plates anchors bracings truss accessories splicing and stiffeners where related to the analysis shall be included in the design report. Jkr 20800 0183 14 01 00 29 januari 2014 a 3 hakcipta jkr malaysia 4 3 any discrepancies shall be referred as soon as possible to the s o. V drawings shall take preference over standard specifications.
7 2 where goods materials and workmanship are referred to the abbreviations bs cp or ms reference is respectively made to the british standard codes of practice and malaysian standard and they are to conform thereto unless otherwise stated. The applied bending moment shall be calculated from the following equation. In the new jkr specification it is specified that the targeted margin should be about twice the standard deviationwhich means at least a margin of 6 n mm2 to 12 n mm2. Clips and fasteners 6.
The reinforced concrete coping shall be laid to fall complete with 12 mm half round throating. Jkr standard specification 2014 pdf the use of accelerated curing methods for concrete containing other types of cement or any admixture or any additional materials shall be to the approval of the s. Drawings and specifications and to the approval of the s o. Concrete jkr spj s reaaa wiki the process shall be repeated until the maximum test load is reached.
Where pile diameter is less than mm. Jkr standard specification 2014 pdf the stone blocks shall in general have their largest faces parallel.